By Garrett
2006 This summer’s project was pouring a concrete drive-around from the east end of the driveway on the north side of the house along the east side of the house to 1200 North . It was approximately 1500 square feet - a lot of digging, leveling, and concrete pouring! My skill improved, and my later sections (each about 10' x 10') were much better than my earlier ones. It was really nice to have the drive-around during the winter.
No comments:
Post a Comment